Access Platform & Safety Shower Upgrade

Home » Projects » Access Platform & Safety Shower Upgrade

Project Date

April 2022

Project Duration

2.5 Weeks

Client

Trility

Location

MPF Workshop, Tauranga & WWTP Rotorua

Project Description

MPF Engineering was engaged to design and construct a new access platform and complete an upgrade to the site safety shower system.

The safety shower was fully custom manufactured from 316 stainless steel to suit the site environment. Due to the works being carried out within an ethanol bund tank area, all fabrication and installation were completed without hot works, ensuring compliance with site safety and hazard control requirements.

Key Features & Considerations

  • Custom-designed and built access platform
  • Fully custom 316 stainless steel safety shower
  • No hot works permitted due to ethanol bund environment
  • Safety-focused design and installation approach
Access Platform & Safety Shower Upgrade - Project by MPF Engineering