Project Date
February 2022
Project Duration
1.5 Weeks
Client
Pure Bottling
Location
Tauranga

Project Description
MPF Engineering was engaged to design, manufacture, and install a new clear protective cover for a bottle filling machine.
The solution was custom-designed to suit the existing equipment, ensuring safe operation while maintaining visibility and accessibility for production and maintenance requirements. Fabrication and installation were completed to meet site-specific operational needs.