Project Date
August 2022
Location
Te Puke & Katikati
Project Description
MPF Engineering supplied and installed large industrial dehumidification systems for the kiwifruit industry, supporting post-coolstore handling and packing operations.
The systems were designed to control moisture levels as fruit exits cool storage, helping to ensure identification stickers remain securely adhered during downstream processing and packing. Effective humidity control in this stage is critical to maintaining product traceability and presentation.
A total of three dehumidification systems were installed across multiple sites.
Installation Locations
- Two systems at Trevelyan’s Packhouse and Coolstore, Te Puke
- One system at Apata, Katikati