Project Duration

Pre Fabrication 1 Month – Install Annual Shut 11 day window

Client

Oji Fibre Solutions Tasman

Location

Kawerau

Oji Fibre Solutions

Project Description

MPF Engineering assisted Oji Fibre Solutions with the design and execution of a geothermal steam system upgrade.

The scope of work included engineering input into system design, along with the planning and coordination of tie-in locations and shutdown timings to minimise operational disruption. MPF Engineering supplied, prefabricated, and installed the required pipework, with extensive workshop pre-spooling completed to support efficient and controlled site installation.

All works were carried out in accordance with applicable steam and pressure piping standards and supported by comprehensive inspection and testing processes.

 

Standards & Quality Assurance

  • Engineering support for system design and tie-in planning
  • Geothermal steam pipework upgrade
  • Pipework ranging from 25 NB to 300 NB
  • Schedule 40 pipe
  • Pipework installed to ASME B31.1 requirements
  • Workshop pre-spooling and site installation
  • Third-party witnessed hydrostatic testing
  • 100% radiographic NDT on all site welds