Project Date
May 2022
Project Duration
8 Weeks
Client
Oji Fibre Solutions - Tasman
Location
MPF Workshop

Project Description
MPF Engineering was contracted to manufacture a stainless steel roof replacement and complete the installation during the client’s annual shutdown period.
The roof structure was fully fabricated in-house, with critical joints welded in accordance with AS/NZS 1554.6 requirements. To facilitate safe and efficient transport to site, the roof assembly was manufactured as a complete unit and then disassembled prior to delivery.
Standards & Quality Assurance
- Stainless steel roof replacement
- Manufactured and installed during annual shutdown
- Critical joints compliant with AS/NZS 1554.6
- Full Inspection and Test Plan (ITP) supplied
- Fully fabricated and disassembled for transport