HD Roof Replacement - Manufacture

Home » Projects » HD Roof Replacement – Manufacture
HD Roof Replacement - Manufacture - Project by MPF Engineering
HD Roof Replacement - Manufacture - Project by MPF Engineering
HD Roof Replacement - Manufacture - Project by MPF Engineering

Project Date

May 2022

Project Duration

8 Weeks

Client

Oji Fibre Solutions - Tasman

Location

MPF Workshop

Oji Fibre Solutions

Project Description

MPF Engineering was contracted to manufacture a stainless steel roof replacement and complete the installation during the client’s annual shutdown period.

The roof structure was fully fabricated in-house, with critical joints welded in accordance with AS/NZS 1554.6 requirements. To facilitate safe and efficient transport to site, the roof assembly was manufactured as a complete unit and then disassembled prior to delivery.

 

Standards & Quality Assurance

  • Stainless steel roof replacement
  • Manufactured and installed during annual shutdown
  • Critical joints compliant with AS/NZS 1554.6
  • Full Inspection and Test Plan (ITP) supplied
  • Fully fabricated and disassembled for transport
HD Roof Replacement - Manufacture - Project by MPF Engineering
HD Roof Replacement - Manufacture - Project by MPF Engineering
HD Roof Replacement - Manufacture - Project by MPF Engineering
HD Roof Replacement - Manufacture - Project by MPF Engineering