Project Date
January 2022
Project Duration
3 Months
Client
Mount Pack & Cool (MPac)
Location
Tauranga, Tauriko

Project Description
MPF Engineering fabricated and installed stainless steel dust extraction ducting for an on-site application.
The project included the manufacture and installation of special-order spiral-weld ducting, ranging in sizes from 10 inch to 20 inch diameter. Works were completed under very tight timeframes to ensure the system was operational ahead of the client’s packing season.
Standards & Quality Assurance
- Stainless steel dust extraction ducting
- Fabricated and installed on site
- Special-order spiral-weld ducting
- Diameter range: 10 inch to 20 inch
- Delivered within tight project deadlines