Project Date
October 2023
Project Duration
6 Months
Client
Red Stag Timber
Location
Rotorua

Project Description
MPF Engineering completed pipework supply and installation works for the PTP2 Boron Treatment Plant, with a significant portion of the project prefabricated in our dedicated non-ferrous workshop.
Off-site prefabrication allowed for improved quality control, reduced site installation time, and safer execution within the operational plant environment. All works were carried out in accordance with approved welding procedures and applicable piping standards.
Scope & Technical Details
- Pipework supply and installation for boron treatment plant
- Extensive workshop pre-spooling in dedicated non-ferrous facility
- Stainless steel pipework ranging from 50 NB to 250 NB
- Schedule 10 stainless steel pipe
- Welding completed to ASME IX procedures
- Pressure testing completed
- Full Inspection and Test Plans (ITP) and NDT records supplied