Savall Brownfields Pipework

Home » Projects » Savall Brownfields Pipework
Savall Brownfields Pipework - project by MPF Engineering
Savall Brownfields Pipework - project by MPF Engineering
Savall Brownfields Pipework - project by MPF Engineering

Project Date

July 2022

Project Duration

5 Months

Client

Whakatane Board Mill

Location

Whakatane

Whakatane Mill

Project Description

MPF Engineering completed mechanical and piping brownfields installation works at the Whakatāne Board Mill as part of a Savall project.

The scope involved the installation of new Schedule 10 pipework ranging from 4 inch to 12 inch diameter, routed through an operational factory environment. All welding was completed in accordance with approved ASME IX welding procedures and ASME B31.3 piping code requirements.

In addition to piping works, MPF Engineering carried out pump and motor replacement within a tightly constrained shutdown window, requiring careful planning and efficient execution to meet programme requirements.

 

Standards & Quality Assurance

  • Mechanical and piping brownfields installation
  • Schedule 10 pipework ranging from 4 inch to 12 inch
  • Welding completed to ASME IX procedures
  • Piping installed to ASME B31.3 requirements
  • Pump and motor replacement
  • Works completed within a very tight shutdown timeframe