


Project Date
February 2022
Client
Coollogic Christchurch
Location
Edgecumbe
Project Description
MPF Engineering specialises in industrial refrigeration and has been involved in multiple EastPack sites over a number of years.
This project included the installation of refrigeration systems across six coolstores and eighteen Controlled Atmosphere (CA) storage rooms. The scope involved ammonia-based refrigeration utilising three Sabroe ammonia chiller units, supplying cooling to a large network of evaporator coils throughout the facility.
Extensive stainless steel dairy tube pipework was installed, with the majority of fabrication completed in-house at MPF Engineering’s workshop to ensure quality control and efficient site installation.
Standards & Quality Assurance
- 6 coolstores and 18 CA stores
- 3 × Sabroe ammonia chiller units
- 48 evaporator coils installed
- Stainless steel dairy tube ranging from 10 inch to 1.5 inch
- Over 700 metres of pipework installed
- Pre-fabrication completed in MPF Engineering workshop

