Condenser Pipework

Condenser Pipework

Home Condenser Pipework
  • Project Date

    14.10.2024

  • Project Duration

    8 Months

  • Client

    Redstag Timber

  • Location

    Prefabrication at MPF Workshop | Installation in Rotorua

Project Description

  • Pipe sizes 100nb – 600nb
  • ASME B31.3
  • Tight access for the large dia pipe proved to be a challenge