HD Roof Replacement – Manufacture

HD Roof Replacement – Manufacture

Home HD Roof Replacement – Manufacture
  • Project Date

    05.2022

  • Project Duration

    8 Weeks

  • Client

    Oji Fibre Solutions – Tasman

  • Location

    MPF Workshop

Project Description

MPF where contracted to manufacture the stainless steel roof replacement and install at the annual shut

  • AS/NZS 1554.6 on critical joins
  • Full ITP supplied
  • Manufactured complete and disassembled for transport