Natural Gas Pipe Work

Natural Gas Pipe Work

Home Natural Gas Pipe Work
  • Project Date

    April 2023

  • Project Duration

    12 Months

  • Client

    ABC Pipe Fitters / Aquaheat

  • Location

    Tauranga, Tauriko

Project Description

Install of carbon pipework to supply natural gas throughout the Winstone wallboards GIB board facility.

  • ASME B31.8
  • 50nb to 250nb sch40 pipe
  • Supply and install with workshop pre-spooling
  • Pressure test
  • ITP and NDT records