PTP2 Boron Treatment Plant

PTP2 Boron Treatment Plant

Home PTP2 Boron Treatment Plant
  • Project Date

    03.10.2023

  • Project Duration

    6 Months

  • Client

    Red Stag Timber

  • Location

    Rotorua

Project Description

A large part of the project was pre-spooled in our dedicated non-ferrous workshop. Amazing wooden building.

  • ASME IX
  • 50nb to 250nb sch10 stainless steel pipe
  • Supply and install with workshop pre-spooling
  • Pressure Test
  • ITP and NDT records