Project Date
17.10.2022
-
Project Duration
6 Months
-
Client
Lawter
-
Location
Lawter Site
Project Description
The project consisted of:
- Destruct old redundant lines in the factory
- sch10 stainless replacement lines
- Working in with running factory timing works around planned shutdowns
- MPF provided all IFC construction isometrics
- Design verification of pipework