-
Project Date
01.06.2022
-
Project Duration
6 months, intermittent delivery times due to site
-
Client
Fulton Hogan Ltd
-
Location
Auckland, Rosedale
Project Description
MPF assisted Fulton Hogan at Rosedale WWTP with the Pipe pre-spooling and fitting of the 300nb pipe work.
MPF Provided:
- QA pack with ITP
- IFC isometric drawings
- Radiography NDT provided at 10%
- Hydrostatic NDT in house