Rosedale WWTP | Bio-Gas Pipe Work

Rosedale WWTP | Bio-Gas Pipe Work

Home Rosedale WWTP | Bio-Gas Pipe Work
  • Project Date

    01.06.2022

  • Project Duration

    6 months, intermittent delivery times due to site

  • Client

    Fulton Hogan Ltd

  • Location

    Auckland, Rosedale

Project Description

MPF assisted Fulton Hogan at  Rosedale WWTP with the Pipe pre-spooling and fitting of the 300nb pipe work.

MPF Provided:

  • QA pack with ITP
  • IFC isometric drawings 
  • Radiography NDT provided at 10%
  • Hydrostatic NDT in house